The summer house, at the end of summer, still without its access apron or embellishments - can you just see, through the windows? - stacked to the gunnels with pottery supplies. The upper garden is full of junk for the skip; the shed is stripped of all electrical connections and cables... soon it will be called "The Studio"! It will be warm, painted, clean and full of all that material now in the summer house. The skip will have gone, followed by the workers and I can move in and perhaps never be heard of again. There is even wifi signal in there and two powerful gas heaters, two kilns, lots of shelves, a large work table, hot and cold running water, a sink. There shall have to be a champagne launch, for sure.
0 Comments
Leave a Reply. |
Archives
April 2024
Categories
|